|
|
|
|
|
|
|
|
|
|
Project name:
|
Powerplant
|
|
Location:
|
Eemshaven
|
|
Client:
|
Nuon
|
|
Managing Contractor:
|
Mitsubishi Heavy Industries
|
|
Installation Contractor:
|
Ballast Nedam Industriebouw
|
|
Scope
|
Engineering, supply, prefabrication and supervision on installation of the GRP cooling water system
|
|
System type:
|
Cooling water system, intake and outfall |
|
Material:
|
Glass fibre reinforced polyester, PN4
|
|
Diameter range:
|
NW1800 - NW2800 |
|
|
|
|
|
|
|
|
|